- Location: M25 betweteen the on/off slips at Junction 7, Merstham, Surrey
- Time and date 1604 04/08/21
- Aircraft/camera used DJI Mini2
Some interesting facts about the m25: It opened in 1986 (same year as I) had its first breakdown hours after Maggie Thatcher opened it. It is 117 miles long and coat £7.5 million a mile to build. The highest point of the m25 is at Reigate Hill (Junction 8) at 700ft.